Quick Navigation
GAUGE#1
The distance between the rails on a track, affecting train compatibility and layout design.
SCALE#2
The proportional size of the model compared to the real train, such as HO or N scale.
TRACK PLANNING#3
The process of designing the layout of tracks to ensure effective train operations and aesthetics.
SCENERY TECHNIQUES#4
Methods used to create realistic landscapes, including grass, trees, and buildings.
ELECTRICAL WIRING#5
The setup of electrical components to power trains and accessories on the layout.
LOOP OF TRACK#6
A circular arrangement of track that allows trains to run continuously.
MODEL TRAIN#7
A miniature representation of a train, used for hobbyist layouts and displays.
TERRAIN FEATURES#8
Natural elements like hills and valleys created on the layout to enhance realism.
ROLLING STOCK#9
The vehicles that move on the tracks, including cars and locomotives.
POWER SUPPLY#10
The source of electricity that powers the trains and accessories on the layout.
WIRING DIAGRAM#11
A visual representation of the electrical connections required for the layout.
SCENERY MATERIALS#12
Various items used to create realistic landscapes, such as foam, plaster, and foliage.
TRAIN OPERATIONS#13
The management and movement of trains on the layout, including speed and direction.
OPERATIONAL EFFICIENCY#14
The effectiveness of train movements and layout design in minimizing delays.
MODEL RAILROADING#15
The hobby of building and operating miniature train layouts.
TRACK CONFIGURATION#16
The arrangement of tracks, including straight sections, curves, and switches.
BUILDINGS AND DETAILS#17
Structures and small elements added to the layout for realism.
PRELIMINARY LAYOUTS#18
Initial sketches or plans for the arrangement of tracks and scenery.
COMPARISON CHART#19
A visual tool used to compare different scales and gauges for informed decision-making.
TEST RUN#20
A trial operation of the train on the layout to check performance and troubleshoot issues.
PRESENTATION#21
The act of showcasing your completed model train layout to others.
COMMUNITY ENGAGEMENT#22
Interactions with fellow hobbyists, sharing experiences and learning from each other.
REFLECTION#23
The process of thinking back on your learning journey and experiences during the course.
HANDS-ON PROJECT#24
A practical assignment where students apply learned skills to create a model train layout.